Projects

Hotel, Chișinău

Supply, installation and commissioning of HVAC, ventilation, plumbing, heating and fire-protection systems for the reconstruction of a 9,500 m² hotel.

Hotel, Chișinău

Engineering challenges

A hotel reconstruction on a fixed handover schedule, where many decisions are made on site.

  • Noise levels in guest rooms
  • Small technical rooms shared by equipment, pipework and other services
  • Phased handover with tight deadlines
  • Coordination with the other trades
  • Redesign and on-the-spot decisions, because the building is being reconstructed

Solution

Every engineering decision is checked against two references: technical correctness and the hotel brand's own standards (brand book). Each on-site redesign is worked through with the other trades before installation, so the systems fit the building as it is being rebuilt.

Result

Project in progress, with phased handover. Completion planned for 2027. Commissioning records and measured values will be added at handover.